Guide · Contractors · 4 min read · Updated 17 November 2026
How to Prepare Plant Machinery for Low Loader Transport
Short answer
Give the haulier accurate weights and transport dimensions, including attachments. Make sure the collection and delivery sites have firm, level ground and space for the vehicle. Clean off mud, secure or remove loose attachments, lower the boom, lock moving parts and have a competent operator available to drive the machine on and off. Check paperwork, keys and any delivery restrictions before the day.
Start with accurate information
The single most important thing you can do is give the haulier accurate details. The operating weight, the transport length, width and height, and the weight and size of any attachments decide which vehicle comes, whether notifications are needed and how the load is secured. Guesswork leads to the wrong vehicle arriving, wasted journeys and, in the worst cases, an overloaded or overheight vehicle on the road.
Use the manufacturer's specification for the exact model and configuration. Remember that buckets, breakers, counterweights and wider tracks all change the figures.
- Make, model and operating weight
- Transport length, width and height
- Attachments and whether they travel fitted or separately
- Track width or tyre size
- Collection and delivery addresses and contacts
Preparing the site
Low loaders and plant lorries need firm, level ground to load safely. Soft ground, steep slopes and uneven surfaces make ramps unstable and can trap the vehicle. Make sure there is enough space for the vehicle to get in, turn and get out, and that overhead cables and trees will not interfere with loading or high loads.
Tell the haulier about any access restrictions, such as narrow gates, weight limits on site roads, height barriers or delivery time windows. On construction sites, check whether the driver needs an induction or specific personal protective equipment.
| Site check | Why it matters | What to do |
|---|---|---|
| Ground conditions | Ramps and trailers need firm footing | Provide hardstanding or mats |
| Space to turn | Articulated trailers need room | Clear the area and plan the route |
| Overhead hazards | Cables and trees affect tall loads | Identify and mark them |
| Access restrictions | Gates, barriers and time windows | Tell the haulier in advance |
| Site rules | Inductions and protective equipment | Arrange before the driver arrives |
Preparing the machine
Clean heavy mud off tracks and the body before loading. Mud can fall onto the road during transport, and it adds weight and hides tie-down points. Lower and fold the boom and arm into the manufacturer's transport position, and remove or secure attachments so they cannot move. Lock any swinging or articulating parts.
Check the machine for fluid leaks and fix them if possible, as leaks can make trailer decks slippery. Make sure the keys are available and the battery and fuel are sufficient to drive the machine on and off.
Ask whether the haulier needs any site-specific information in advance, such as a gate code, a contact name or a delivery reference. On busy construction sites, deliveries are often booked into slots, and a driver arriving without the right reference can be turned away or kept waiting at the gate.
Loading and securing
Machines are usually driven on and off by a competent operator, either the haulier's driver or someone you provide. The machine should be positioned centrally on the deck to balance the axle loads, then secured with chains or straps to rated anchor points, following the manufacturer's tie-down points. The DVSA publishes guidance on load security, and drivers are responsible for checking the load is secure before setting off.
Loose items such as buckets and tools should travel separately or be secured to the deck, never left in a bucket or on the machine.
Before transport, check that the machine's safety locks are engaged, the cab door and windows are closed and secured, and mirrors and beacons that stand proud of the machine are folded or removed if they would increase the overall width or height. Anything loose in the cab, such as tools, flasks or paperwork, should be removed so it cannot fly around during braking.
Paperwork and timing
Confirm the collection and delivery times and any restrictions at the delivery site. If the load is abnormal, notifications need to be made in advance through ESDAL, so allow time. Have any hire paperwork, delivery notes and contact numbers for site staff ready. Check your own insurance for the machine in transit, and ask the haulier about their goods-in-transit cover and its limits.
Make sure someone is on site at both ends to receive the machine and sign for it. Waiting time is often charged.
On the day
Have the machine ready, keys available and the loading area clear before the vehicle arrives. Walk the driver through any site hazards and confirm where the machine will be loaded and unloaded. Stay available during loading in case questions come up about attachments or securing. At delivery, check the machine for damage before signing the delivery note, and record any issues with photos. Small checks at handover save long disputes later, and they help the haulier improve for the next move.
Common problems to avoid
The most frequent problems are inaccurate weights or dimensions, no one on site to receive the machine, soft or blocked loading areas and missing keys. Each causes delays and often extra charges. Spending a few minutes confirming details with the haulier and site teams before the day avoids most of them and keeps your plant moving on schedule.
It also helps to keep a simple record for each machine with its transport dimensions, weights and any special loading notes. Sharing it with the haulier every time the machine moves saves repeated questions, reduces mistakes and means the right vehicle arrives first time, whichever driver is sent.
Questions people also ask
Who drives the machine onto the low loader?
Usually a competent operator, either the haulier's driver or an operator supplied by you. Many plant drivers are trained to load common machines. Confirm in advance who will load and unload, especially for unusual or very large machines.
Should attachments travel on the machine?
It depends on the machine and the attachment. Some can travel fitted in the transport position, while others should be removed and secured separately on the deck. Tell the haulier what attachments are travelling so they can plan the weight, dimensions and securing.
Why does the haulier need exact dimensions?
The dimensions decide which vehicle comes, whether the load is abnormal and needs notifications, and whether the route has suitable bridge heights. Inaccurate figures can mean the wrong vehicle, wasted journeys or an illegal load on the road.
Written and checked by the Low Loader Transport team. Read our editorial policy.
More guides
How Much Does Low Loader Transport Cost in the UK?
Moving a mini digger or small plant locally on a 7.5-tonne beavertail typically costs £180–£350. An 8–14 tonne excavator moved regionally costs…
Abnormal Load Rules in the UK: STGO, ESDAL and VR1 Explained
An abnormal load is an indivisible load that exceeds normal vehicle size or weight limits. In Great Britain these move under the STGO, which sets…
Types of Low Loader Trailer: Which One Does Your Load Need?
Beavertail plant lorries carry mini diggers and small plant. Rigid plant lorries with hydraulic ramps handle mid-size machines. Step frame trailers…
How to Choose a Low Loader or Heavy Haulage Company
Choose a haulier with a valid goods vehicle operator's licence, the right trailers for your load, goods-in-transit and public liability insurance…
Get a free low loader transport quote
Tell us what you need and we'll come back with a clear price.
Request a quote