Abnormal Load Rules in the UK: STGO, ESDAL and VR1 Explained

Short answer

An abnormal load is an indivisible load that exceeds normal vehicle size or weight limits. In Great Britain these move under the STGO, which sets vehicle categories, limits and notice rules. Loads above set thresholds must be notified to the police, highway authorities and bridge owners, usually via ESDAL. Loads wider than 5 metres need a VR1 from National Highways, and the very largest need a special order.

Abnormal Load Rules in the UK: STGO, ESDAL and VR1 Explained

What counts as an abnormal load

Normal goods vehicles in Great Britain operate under the Road Vehicles (Construction and Use) Regulations, which set limits such as a maximum vehicle width of 2.55 metres and a maximum gross weight of 44 tonnes for most articulated combinations on six axles. A load becomes abnormal when it cannot be carried within those limits and cannot reasonably be broken down into smaller parts. That second condition matters: the load must be indivisible. A large excavator is indivisible; a pile of steel beams that could be split across two lorries is not.

Abnormal indivisible loads are carried under the Road Vehicles (Authorisation of Special Types) (General) Order 2003, usually called STGO, rather than the normal rules.

Width is the dimension that most often tips plant into the abnormal category. Many large excavators have tracks or undercarriages wider than 2.55 metres, so even a machine that is well within weight limits can need to travel under STGO. Removing attachments, counterweights or extendable track frames where the manufacturer allows can sometimes bring a load back within normal limits.

STGO categories

STGO divides heavy vehicles into categories by gross weight, each with its own requirements for axle weights, vehicle markings and notice. Hauliers choose the category based on the total weight of the vehicle and load. The table gives a simplified overview of the three main categories.

Vehicles operating under STGO must display the correct plates and meet the technical conditions for their category, and the operator remains responsible for following the rules throughout the journey.

CategoryMaximum gross weightTypical use
Category 1Up to 46 tonnesHeavier plant slightly over normal limits
Category 2Up to 80 tonnesLarge excavators, cranes and heavy machinery
Category 3Up to 150 tonnesVery heavy plant and industrial equipment
Special orderAbove 150 tonnes or beyond STGO limitsTransformers, very large structures

Notifying the authorities

Loads above set width, length or weight thresholds must be notified in advance to the police, highway authorities and bridge owners along the route. In practice, most notifications are made through ESDAL, the Electronic Service Delivery for Abnormal Loads system run by National Highways, which routes the notice to the relevant organisations and returns any route restrictions.

Notice periods depend on the load. Wider loads need notice to the police, and heavier loads need notice to highway and bridge authorities, with longer notice for the heaviest weights. Hauliers build these notice periods into their planning, which is why abnormal loads cannot usually be moved at very short notice.

  • Police are notified for loads over the width and length thresholds
  • Highway and bridge authorities are notified for loads over weight thresholds
  • Longer notice is required for the heaviest loads
  • Authorities may impose route or timing restrictions
  • Notifications are normally made through ESDAL

VR1 and special orders

Loads wider than 5 metres need a VR1 authorisation from National Highways in addition to the normal notifications. The application must be made in advance and sets out the load, the vehicle and the route. VR1 covers loads up to the STGO width limit.

The largest loads, which exceed STGO limits altogether, need a special order. Special orders take longer to obtain and often involve detailed route surveys, structural checks on bridges and coordinated police escorts. Moves of this size are planned months rather than days in advance.

Escorts and attendants

Wider and longer loads may need attendants to travel with the vehicle, and some need escort vehicles to warn other road users and help manage junctions and narrow sections. The requirement depends on the load's dimensions and the route. Police may require their own escort or set conditions for very large or difficult moves. Escort vehicles typically cost £400–£700 per day.

Abnormal loads may also be restricted to certain times of day, such as overnight or outside peak hours, to reduce disruption.

Practical tips for customers

Measure the machine in its actual transport configuration, not from a brochure, and include anything that sticks out, such as mirrors, beacons and bucket teeth. Tell the haulier early if a load might be close to the thresholds, so they can decide whether removing parts would avoid abnormal status. Allow for notice periods in your programme, and be flexible on timing, because authorities can impose restrictions such as night-time movement. Finally, make sure the delivery site is ready, as an abnormal load arriving at a blocked site can be very expensive to hold.

Who is responsible

The haulier operating the vehicle is responsible for making the notifications, choosing the right STGO category, obtaining any VR1 or special order and following the conditions set. As the customer, you should give accurate weights and dimensions, because errors can invalidate a notification and delay the move. Anyone operating goods vehicles over 3.5 tonnes for hire or reward also needs a goods vehicle operator's licence, and drivers must follow drivers' hours and tachograph rules.

For customers, the practical effect of these rules is lead time. An abnormal move cannot usually be arranged for the next morning, because the notice periods must be met before the vehicle sets off. Building the move into your project programme early, and confirming the machine's exact dimensions as soon as possible, avoids delays on site and the cost of plant standing idle while paperwork catches up.

Questions people also ask

What is an abnormal load in the UK?

An abnormal load is an indivisible load that cannot be carried within the normal size and weight limits for goods vehicles, such as a maximum width of 2.55 metres or a gross weight of 44 tonnes. These loads move under the STGO, with notification and other conditions depending on their size.

What is ESDAL?

ESDAL is the Electronic Service Delivery for Abnormal Loads, run by National Highways. Hauliers use it to plan routes and send abnormal load notifications to the police, highway authorities and bridge owners along the route, and to receive any restrictions in return.

When do I need a VR1?

A VR1 authorisation from National Highways is needed for loads wider than 5 metres, in addition to the standard notifications. It must be applied for in advance. Loads beyond STGO limits altogether need a special order, which takes longer to obtain.