Low Loader Transport
Plant Machinery Haulage
Moving excavators, dumpers, rollers, telehandlers and other construction plant between depots, sites and dealers.

What's involved
Most construction plant moves on a beavertail lorry or a semi-low loader. A mini digger up to around 3 tonnes fits a 7.5-tonne beavertail, while 8 to 14-tonne excavators usually go on an 18 or 26-tonne rigid plant lorry with hydraulic ramps. Machines of 20 tonnes and above typically need a tractor unit and semi-low loader. The operator or driver tracks the machine up the ramps, lowers the boom and bucket onto the deck, and the driver secures it with chains and binders to the trailer's lashing points, following the manufacturer's tie-down points. Buckets and attachments travel separately or strapped down. Before collection, give us the machine's make, model, operating weight and height, confirm the site has firm, level ground for loading, and make sure the keys and an operator are available if the driver will not load it.
How we handle it
Share load details
Tell us what you are moving, its weight, length, width and height, the collection and delivery addresses, and preferred dates. Spec sheets or photos help us choose the right trailer.
Trailer and route plan
We match the load to a suitable trailer and check the route for low bridges, weight limits and access. If the load is abnormal, the haulier prepares the required notifications.
Quote and booking
You receive a written quote covering trailer type, loading method, escorts or permits if needed, and delivery window. Abnormal loads need enough lead time for notifications.
Loading and securing
The machine is driven, winched or craned onto the trailer, positioned to balance axle weights and secured with chains, binders and straps rated for the load.
Delivery and unloading
The haulier delivers on the agreed route and unloads by ramp, winch or crane. Check the load on arrival and sign the delivery note once you are satisfied.
Price guide
Low loader transport is priced on the trailer needed, the distance and the time involved, plus any permits, escorts or cranes. A mini digger on a beavertail is a quick local job. Abnormal loads need planning, notifications and sometimes escorts, so they cost considerably more.
- Abnormal load move: from £1,500. Includes notifications; escorts, surveys and special orders add cost.
- Step frame for tall loads: from £550. Cabins, containers and machinery; cranes at either end are extra.
- 20–35 tonne machine on semi-low loader: £700–£1,500. Tractor unit and low loader; longer distances priced on mileage.
Questions about plant machinery haulage
Is my machinery insured during transport?
Licensed hauliers carry goods in transit insurance, but the limit varies and may not cover the full value of expensive plant. Check the cover amount against your machine's value and ask about any excess. Your own plant insurance may also cover transit, so check both policies.
Other services
Abnormal Load Transport
Moving indivisible loads that exceed standard weight, width or length limits, with notifications, escorts and route surveys.
Step Frame and Semi-Low Loader Haulage
Trailers with a lowered deck for tall loads such as machinery, modular buildings and industrial equipment that will not fit standard heights.
Extendable and Multi-Axle Trailers
Long and very heavy loads such as beams, piles, wind turbine parts and transformers on trailers that extend or add axles.
Vehicle and Machinery Recovery Transport
Moving non-running vehicles, tractors, vintage machinery, boats and motorhomes on low-deck trailers with winches.
Site and Depot Moves
Relocating fleets of plant, cabins and equipment between sites, yards and depots, often across several loads and days.
Plant Machinery Haulage near you
Get a free low loader transport quote
Tell us what you need and we'll come back with a clear price.
Request a quote